Integration Boundary Diagram

Where systems meet: integration boundaries

We document what we own and where your systems take over. The interface definitions below name the mechanical, electrical, thermal, and avionics handoff points — and the documented margins that govern each one. Know exactly what you're integrating before you call.
  • 01

    Mechanical interface

    Standardized quick-disconnect payload mounting. Attachment points, shear limits, and cable routing defined in assembly drawings. Margin documented for vibration and thermal cycling stress.

  • 02

    Power distribution

    Battery-to-load voltage rails and peak current limits specified per subsystem. Fault detection and load-shedding thresholds stated with timing. No surprise resets in the mission profile.

  • 03

    Thermal handoff

    Heat rejection capacity and operating-envelope limits published. Your payload thermal load must remain within stated bounds. Mitigation strategies documented if your system approaches margin.

  • 04

    Positioning and comms

    GNSS-denied navigation interfaces and avionics data bus protocols defined. Latency, update rate, and accuracy limits are explicit. No black-box sensor fusion.

  • 05

    Redundancy architecture

    Critical subsystems include documented backup paths and failure modes. Single-point failures flagged where they exist. Your integration must account for the redundancy posture we publish.

  • 06

    Dust and environmental spec

    Regolith abrasion tolerance and seal-life assumptions published. Your sealed components must meet the same environmental class or mitigation is required.

Interface definitions and mechanical boundaries

Mobility interface

Regolith interaction: abrasion testing ongoing; current dust mitigation includes elastomer lip seals and labyrinth packing.

Electrical interfaces

Distribution: three independent circuit branches with isolated return paths. No flight heritage; qualification posture is breadboard and integration-lab testing. Production connectors TBD.

Thermal management

Internal battery pack thermal budget: heater power TBD pending final cell selection. Dust accumulation effects on radiator emissivity under investigation.

Navigation and positioning

Absolute positioning at return: manual waypoint confirmation required. No autonomous orbit-determination or lunar-reference-frame aiding.

Structural and load case

Documented margin on landing-load case: margin calculation ongoing; preliminary data under external review. Vibration isolation: elastomer mounts (durometer TBD) on motor assembly. Long-term fatigue testing at thermal extremes: planned for next phase.

Self-assessment

Self-qualify against platform boundaries

0/ 6

Criteria your mission profile satisfies. Any unchecked line is a boundary to raise before integration.

This checklist is not a qualification record. Checked lines indicate profile fit against documented boundaries only; formal interface verification is scoped during integration review.

Start a mission-fit conversation.

You now have the integration boundaries, qualification posture, and documented limits. If your mission profile aligns with our platform architecture, let's discuss the handoff details—mechanical, electrical, thermal, and avionics interfaces—that confirm the fit.

Moon Buggies

© 2026 Moon Buggies. All rights reserved.